@tine
My new system has 23 cells (LTO) at ~2.3V per cell.
I've received my new system (9-M master + two 2Q slaves), and am wondering what is the best way to divide the cells among the two slaves.
It could be 12 + 11 or 16 + 7, for example.
I'm guessing the first option would be best, as it would more equally dissipate any heat produced during balancing. But are there other considerations?
12 + 11
What is the Master BMS serial?
I have to send you the dedicated firmware update.
@tine
Here is the serial number on my Master box: 9-M-1067.
This is a system with two slaves, to be used with an SMA Sunny Island 6048-US-10 inverter (this inverter is a master with 3 slave inverters, operating at 240/120 VAC split single phase).
The battery bank is 23 series cells, LTO chemistry, 900 amp-hours.
I have send the updat to Rick, so he will forward it to you, there is no attacment ikon here.